We required a footbridge crossing for part of our works on the Lee Tunnel project. We proceeded to purchase a 20m span composite steel and concrete footbridge from Bridges For Sale, which warranted a sustainable and economical approach whilst reducing our over all project costs. The delivery and service during the installation was second to none, whilst Henry and his team offered their patience and understanding in allowing us to install at our convenience. We have no hesitation recommending Bridges For Sale for our future project requirements.
10m x 2m Timber bridge
Bridge style:
Pedestrian
Bridge material:
Timber C24 tanalised.
Deck material:
Timber construction with timber deck complete with non-slip inserts.
Deck surface:
Timber construction with timber deck complete with non-slip inserts.
Weight of bridge:
4.5 tonnes
Age:
6 months
Condition of bridge:
Excellent
Design standards:
Euro-code 10m x 2m Timber bridge
Bridge style:
Pedestrian
Bridge material:
Timber C24 tanalised.
Deck material:
Timber construction with timber deck complete with non-slip inserts.
Deck surface:
Timber construction with timber deck complete with non-slip inserts.
Weight of bridge:
4.5 tonnes
Age:
6 months
Condition of bridge:
Excellent
Design standards:
Euro-code If you would like to request further information about the selected bridge, register your interest or make a bid, please complete the form below.