We required a footbridge crossing for part of our works on the Lee Tunnel project. We proceeded to purchase a 20m span composite steel and concrete footbridge from Bridges For Sale, which warranted a sustainable and economical approach whilst reducing our over all project costs. The delivery and service during the installation was second to none, whilst Henry and his team offered their patience and understanding in allowing us to install at our convenience. We have no hesitation recommending Bridges For Sale for our future project requirements.
12m x 2.2m Pedestrian bridge (Steel)
Bridge style:
Beam Bridge
Bridge material:
Steel
Deck material:
Durbar
Deck surface:
Chequer plate
Weight of bridge:
4 tonnes
Age:
7 Years
Condition of bridge:
Average 12m x 2.2m Pedestrian bridge (Steel)
Bridge style:
Beam Bridge
Bridge material:
Steel
Deck material:
Durbar
Deck surface:
Chequer plate
Weight of bridge:
4 tonnes
Age:
7 Years
Condition of bridge:
Average If you would like to request further information about the selected bridge, register your interest or make a bid, please complete the form below.